MET T+4d 07hUTC 06:05:00

Artemis 2 Mission Timeline

Launch, parking orbit, translunar injection, lunar blackout, free-return, and reentry are mapped against the mission elapsed time clock.

Launch - LC-39B

MET +0.0h

SLS lifts off from Kennedy Space Center.

MECO + LAS Jettison

MET +0.1h

Core stage separation and ascent abort system jettison.

Solar Array Deploy

MET +0.3h

Orion deploys all four solar arrays.

ICPS Burns

MET +0.8h

Parking orbit raise and setup burns.

Proximity Ops Demo

MET +4.5h

Crew tests Orion handling near the ICPS stage.

ICPS Disposal

MET +5.5h

Interim Cryogenic Propulsion Stage disposal maneuver.

High Earth Orbit

MET +24.0h

Crew completes checkout while in high Earth orbit.

Translunar Injection

MET +25.5h

A 30-minute burn sends Orion toward the Moon.

Trajectory Correction 1

MET +72.0h

Outbound mid-course correction burn.

Trajectory Correction 2

MET +96.0h

Pre-flyby trim burn before lunar encounter.

Lunar SOI Entry

MET +118.0h

Orion enters the Moon gravitational sphere of influence.

Closest Approach - Moon

MET +130.0h

Approx. 9,650 km above the lunar surface.

Human Distance Record

MET +131.0h

Projected to exceed the Apollo 13 distance record.

Far Side Blackout

MET +132.0h

Communications blackout behind the Moon for about 45 minutes.

Free-Return Slingshot

MET +140.0h

Lunar gravity redirects Orion back toward Earth.

Radiation Shielding Test

MET +192.0h

Crew conducts deep-space radiation surveys.

Reentry Preparation

MET +216.0h

Cabin and recovery systems are configured for return.

CM / SM Separation

MET +232.0h

Crew module separates from service module.

Atmospheric Reentry

MET +233.5h

Heat shield reaches peak thermal load.

Splashdown - Pacific Ocean

MET +234.0h

Recovery forces retrieve the Orion crew module.